An adjuster, an underwriter and a litigator each need the same thing from an engineering finding: that it holds up against the other side's expert.
A plausible theory does not. A finding that has measured the failure mechanism, excluded the competing explanations with logged evidence, and been written so a non-engineer can follow it — that does. We work on both sides of the loss: forensic investigation after it, and risk engineering before it.
After the loss — forensic engineering
Root cause investigation of electrical and mechanical failures and the electrical causes of fires, using measurement and analysis rather than inference from damage patterns alone. Our strongest forensic ground is electrical failure and power quality: harmonic distortion, transient overvoltage, resonance, protection coordination failure, and the interaction between standby generation and sensitive loads.
Evidence preservation. Guidance on securing and documenting failed equipment before it is disturbed, which is frequently the difference between a defensible finding and an unprovable one.
Excluding candidate causes is as much of the work as identifying the actual one. On a recent campus claim, the prime suspect — a power-factor-correction capacitor bank — was investigated and excluded with logged data before the cause was established elsewhere.
Expert reporting written so a decision-maker who is not an engineer can follow the finding. We report what the evidence supports, including when that is unhelpful to the retaining party's position; that is the only basis on which forensic work has value.
Full scope on the forensic engineering and loss consulting page; electrical investigations in detail on forensic electrical engineering.
Before the loss — risk engineering
Brokers and underwriters increasingly want an engineered view of a risk rather than a visual one. Three packaged assessments, under the Furano Risk Engineering service line:
Electrical risk survey. Condition and hazard assessment of the electrical distribution, with power quality measured during the survey mobilization rather than estimated afterwards.
Power system study package. Arc flash, protective device coordination and short circuit studies, sealed, with CSA Z462 labelling and the model file returned.
Loss exposure and resilience review. Single points of failure, standby capability, and the business-interruption exposure that current equipment lead times create — medium-voltage switchgear, large transformers and generators now run from one to two years, which changes what a replacement loss actually costs.
What carries these assessments is that we own the instrumentation — Class A power quality analyzers to IEC 61000-4-30 — and employ our own field staff, so measurement happens on the first visit. Competing reports in this size class are visual and documentary.
Standards, cited by edition
CSA Z462 and IEEE 1584-2018 for arc flash. IEEE 519 for harmonic limits, applied at the point of common coupling — a facility is not "IEEE 519 compliant" in the abstract. CSA Z463:24 alongside NFPA 70B for electrical maintenance. In British Columbia the enforceable electrical safety instrument is the WorkSafeBC Occupational Health and Safety Regulation, Part 19, with CSA Z462 as the referenced practice standard. Reports name the edition they rely on, because the other side's expert will.
Independence and conflicts
We do not investigate a loss at a site we assessed before it without disclosing the prior engagement to every party. Where that creates a conflict, we say so before accepting the file.
Selected work
Unit substation failure investigation — medium-voltage service entrance — A unit substation fault traced to how its secondary conductors were installed. Later damage to the transformer was identified as a separate cause.
Transformer failure investigation — industrial distribution system — A recently commissioned transformer failed on re-energisation and tripped the site's main substation. Relay event data placed the fault in the transformer, teardown established the cause, and the protection design was excluded.
Forensic power quality investigation — 24.9 kV campus facility — Retained on an insurance claim after ten months of recurring variable frequency drive failures. Root cause established as harmonic distortion exceeding IEEE 519 limits at the point of common coupling, with the standby generator's high source impedance amplifying distortion three- to four-fold on standby power.
Power quality metering programme — agricultural producer — Recurring 3,000 A main breaker trips traced to a sustained zero-sequence imbalance from LED grow-light driver leakage, after harmonics were measured and excluded.
Post-fire electrical and mechanical restoration at a greenhouse producer — Owner's representative after a fire: damage assessment, emergency response and the restoration design and construction, run alongside the claim.
Replacement cost evaluation for district energy transfer stations — Replacement cost analysis of the mechanical and plumbing systems in a municipal district energy utility's energy transfer stations, prepared to set insurance coverage.
Services for this sector
Forensic engineering and loss consulting · Power quality · Power system studies · Remediation engineering
Talk to us about a file
Send us what you have — the loss description, the site, the equipment involved and the timeline — and we will tell you plainly whether it is a file we should take.