Lower Mainland, BC · Mechanical engineering · Risk engineering
What would it cost to replace the mechanical and plumbing systems in a district energy utility's energy transfer stations? The answer set the insurance coverage.
Challenge
A municipal district energy utility operates energy transfer stations: the buildings that house the large heat exchangers and pumps where the district system hands heat over to each connected development. The utility and its construction manager needed a defensible replacement cost for the mechanical and plumbing systems in those stations, so that the insurance coverage on the infrastructure matched what it would take to rebuild it.
A number like that has to survive two readers: the underwriter pricing the policy, and the finance team planning for the asset's life.
Approach
Engaged by the construction manager on behalf of the utility and the municipality, we carried out a detailed replacement cost analysis of the mechanical and plumbing systems in the energy transfer station buildings.
- Mechanical systems analysis: a detailed evaluation of the mechanical and plumbing systems in each station
- Analysis of the equipment specifications and the installation requirements for replacing them
- Mechanical system specifications and layout schematics documenting what is installed
- Budget estimates for complete system replacement
- Cost evaluation reports written for the insurance purpose they serve
Outcome
The utility has a replacement cost for its energy transfer stations that is built up from the installed equipment and its installation requirements, documented well enough to support both the insurance placement and long-term financial planning.
Services applied
Mechanical engineering · Risk engineering