Healthcare and Institutional

Electrical and mechanical engineering designed from CSA Z32, ASHRAE 170 and health authority design guidelines, including phased work on clinical campuses.

Hospital corridor

Health authority capital teams have a well-earned scepticism. What they need to know is not whether a firm can design a building, but whether its engineers know CSA Z32, ASHRAE 170 and the health authority's Facility Design Guidelines well enough to design from them rather than against them.

The distinction is the whole thing. An engineer who designs first and checks compliance afterwards produces a scheme that gets progressively compromised through review. An engineer who designs from the standards produces one that clears review largely intact, because the constraints were structural from the beginning.

Designing from the standards

CSA Z32. Essential electrical systems, branch separation, isolated power systems where the care area requires them, and the documentation to show which receptacles and which panels serve which branch. Getting branch allocation right at design is straightforward; correcting it after rough-in is not.

ASHRAE 170. Ventilation design driven by pressure relationships, air change rates and filtration by space type — established at the outset from the clinical programme, not reverse-engineered from an equipment schedule.

Facility Design Guidelines. Each health authority maintains its own, and they are not interchangeable. We design to the guideline of the authority that will own the building, and we read the current revision rather than the one we used last time.

Working on an operating campus

Most healthcare work is not greenfield. It is a phased intervention in a building that cannot close, next to clinical operations that cannot be interrupted.

That constrains engineering in ways that do not appear on a drawing. Tie-ins happen in windows measured in hours. Temporary power and temporary ventilation have to hold clinical standards, not construction standards. Infection control requirements govern how and when work proceeds, and a design that ignores them generates change orders and access refusals.

Generator and ATS modernisation is the sharpest version of this problem: replacing the systems that exist to keep the campus alive, without the campus losing them. That work is sequencing design as much as electrical design, and we treat it that way.

What we do here

  • Essential electrical systems design to CSA Z32, including isolated power
  • Ventilation design to ASHRAE 170 — pressure relationships, air changes, filtration by space type
  • Generator, UPS and automatic transfer switch design and modernisation on live campuses
  • Phased tie-in and temporary systems planning around clinical operations
  • Clinical fit-outs — imaging, procedure and treatment spaces
  • Institutional ground-up projects
  • Life-safety systems and fire alarm coordination
  • Health authority Facility Design Guideline compliance and AHJ submissions

Selected work

Phased cooling replacement with heat pumps at an operating care facility — Failing cooling on four air handling units replaced with heat pumps in phases, with the building open and held to its infection prevention and control requirements throughout, and the controls set to run the heat pumps ahead of the gas plant.

Clinical fit-outs — Treatment and procedure space fit-outs delivered inside operating facilities.

Generator and ATS modernisation on operating campuses — Essential power system replacement staged so clinical operations retained continuous coverage throughout.

Institutional ground-up projects — Full electrical and mechanical design on new institutional buildings.

Expertise

Fire alarm systems · Building systems design · Power system studies

Talk to us about your project

Tell us which health authority owns the building and what stage the capital plan is at. We will tell you what the design has to answer to.

Start a conversation

Talk to us about your project

Send us the scope and the constraints. We will tell you plainly whether we are the right firm for it — and if we are not, we will say so.