Brokers and underwriters increasingly want an engineered view of a risk rather than a visual one. Furano Risk Engineering delivers that: assessments sealed by a professional engineer, with the electrical system measured rather than described, written so an underwriter reading over the broker's shoulder is satisfied.
Three packaged assessments
Electrical risk survey. Condition and hazard assessment of the electrical distribution — service, switchgear, protection, standby power — with power quality measured during the survey mobilization rather than estimated afterwards.
Power system study package. Arc flash, protective device coordination and short circuit studies, sealed, with CSA Z462 labelling and the model file returned. Increasingly a prequalification condition rather than a nice-to-have.
Loss exposure and resilience review. Single points of failure, standby capability, and the business-interruption exposure that current equipment lead times create. Medium-voltage switchgear, large transformers and generators now run from one to two years, which changes what a replacement loss actually costs and what a resilient design looks like.
A power quality monitoring session can be added to any of the three.
Why it is different
We own the instrumentation — Class A power quality analyzers to IEC 61000-4-30 — and employ our own field staff, so measurement happens on the first visit. Competing risk engineering reports in this size class are visual and documentary.
Standards, cited by edition
CSA Z462 and IEEE 1584-2018 for arc flash. IEEE 519 for harmonic limits, applied at the point of common coupling. CSA Z463:24 alongside NFPA 70B for electrical maintenance. In British Columbia the enforceable electrical safety instrument is the WorkSafeBC Occupational Health and Safety Regulation, Part 19, with CSA Z462 as the referenced practice standard. Reports name the edition they rely on.
Independence and conflicts
We do not investigate a loss at a site we assessed before it without disclosing the prior engagement to every party. Where that creates a conflict, we say so before accepting the file.
Related
Forensic engineering and loss consulting · Power quality · Power system studies · Insurance and legal
Talk to us about a risk
Send us the account, the site and what the underwriter is asking for, and we will tell you plainly which assessment fits and what it involves.