Skip to content

Case study

Modular E-House and 4.16 kV pump stations at a potash mine

Electrical design for a prefabricated E-House and three booster pump stations with 4.16 kV switchgear at a Saskatchewan potash mine, coordinated across vendors.

Potash mine headframes in winter, Saskatchewan

Saskatchewan · Electrical engineering · Industrial

One prefabricated E-House and three booster pump stations, each with 4.16 kV switchgear, designed to arrive on site ready to connect.

Challenge

A new potash mine needed water moved across the site through a chain of booster pump stations. The owner's delivery model was modular: the electrical rooms, switchgear, HVAC and auxiliary power were to be built into prefabricated buildings off site, with the pumps and drives free-issued from separate vendors. A fourth pump house took pumps only, with no electrical room of its own.

The difficulty in a project like this is rarely the design of any one building. It is the number of parties whose work has to meet inside it: the building fabricator, the switchgear OEM, the pump and drive vendors, the mechanical team supplying the HVAC loads, the owner's own engineering standards, and the site infrastructure the stations connect to. Every interface is a place for scope to fall through.

Approach

We delivered the electrical design for the E-House and the three pump stations, and took the coordination role between the OEMs, the other consultants, the owner and the existing site infrastructure.

Design scope inside each building:

  • Medium-voltage and low-voltage single-line diagrams for the 4.16 kV switchgear and the distribution it feeds
  • Power interconnection of the owner-supplied electrical equipment within the electrical rooms, including routing, termination and cable sizing
  • Cable tray and conduit design and selection for all power, control and instrumentation wiring
  • Cable routing and interconnection drawings covering every power, control and instrumentation circuit
  • HVAC electrical integration, coordinated with the mechanical team for the HVAC power supplies
  • Building services: lighting, receptacles and service wiring to the applicable codes and the owner's project standards
  • Wiring coordination for the free-issued pump vendor instrumentation on the pumps and drives

We stayed on through installation and commissioning, so the questions that come up when prefabricated buildings meet site conditions were answered by the people who had drawn them.

Outcome

The E-House and pump stations were delivered with the electrical scope complete and the vendor interfaces resolved before the buildings reached site. Keeping one consultant responsible for both the design and the coordination meant there was one set of drawings that every vendor's equipment had to fit, rather than four vendors each assuming the others would adapt.

Services applied

Electrical engineering · Power system studies

Industrial, mining and manufacturing · Saskatoon · All work

Talk to us about your project

More work

Talk to us about your project

Send us the scope and the constraints. We will tell you plainly whether we are the right firm for it — and if we are not, we will say so.