Challenge
The development required two high-capacity EV charging hubs — each designed to support more than half a megawatt — to be integrated into Metrotown's existing electrical infrastructure without overloading the site's distribution or disrupting mall operations.
That combination is the hard part. Adding half a megawatt twice over to an operating retail site is straightforward if you are willing to upgrade the service; doing it without a service upgrade requires knowing precisely what capacity is actually available rather than what the single-line suggests should be.
Approach
Acting as owner's representative, we audited the site's electrical distribution before designing anything — power logging and infrastructure evaluation to establish real available capacity under actual operating load, not nameplate assumptions.
The design work that followed included:
- EV hub electrical systems with a strategic energy management approach
- Cable tray and conduit routing engineered for optimised power flow
- Single-line diagrams, power distribution design and load analysis
- Power interconnection between the EV chargers and the mall's existing infrastructure
- Coordination of the control systems governing charging-station operation and load management
Outcome
A coordinated, code-compliant design integrating more than half a megawatt of EV charging capacity per hub into existing infrastructure, while safeguarding reliability and avoiding overload.
The load management strategy is what made it possible to avoid a service upgrade — the hubs draw within the envelope the existing service can support, rather than requiring new capacity from the utility.