Failing cooling systems on four air handling units replaced with heat pumps, in phases, without closing the building.
Challenge
The cooling systems serving four air handling units in a healthcare and community care building were failing. The building could not close for the work: residents and clinical functions stayed in place, and every phase of construction had to hold the facility to its infection prevention and control requirements.
The owner also wanted the replacement to move the building off its mid-efficiency gas plant wherever the new equipment could carry the load.
Approach
We led the design and the installation management of the new heat pumps, with the mechanical and electrical scope in one team.
- Mechanical and electrical schematics for the heat pump systems serving the four air handling units
- Phased construction plans sequenced to keep the building operational and compliant through each stage
- Electrical design for the HVAC and heat pump systems, with conduit design for integrating the new mechanical equipment
- Power interconnection design for the new plant
- Building control upgrade to prioritise the heat pumps over the gas systems, so the efficient plant runs first and the gas plant backs it up
Outcome
Four air handling units back on reliable cooling, installed in phases around an occupied healthcare building, with the controls set to favour the heat pumps and reduce the facility's reliance on gas.
Services applied
Mechanical engineering · Electrical engineering · Building systems design