Furano Pacific Consulting investigates failures of transformers, switchgear, drives, motors, generators and cables for insurers, adjusters, counsel and facility owners. The work establishes the cause, the extent of the damage, and what the repair should cover.
Equipment we investigate
- Power and distribution transformers, liquid-filled and dry-type
- Medium- and low-voltage switchgear, unit substations and motor control centres
- Variable frequency drives, soft starters and motors, including elevator machines
- Standby generators, transfer switches and UPS systems
- Cables, bus duct, splices and terminations
- Protective relays, breakers and their settings
Where the cause sits
A failure has its origin in one of four places, and each points to a different party.
The equipment. A design or manufacturing defect: winding clamping, insulation, connections, components.
The installation. Conductor bending and support, terminations, clearances, grounding, and whether the manufacturer's instructions and the electrical code were followed.
The system. Fault levels above the equipment's rating, protection that did not clear a fault, harmonic distortion, transient overvoltage, or a lightning or switching surge.
Operation and maintenance. Loading, switching practice, deferred maintenance, and how the equipment was handled after an earlier event.
We test each of the four and report which the evidence supports and which it excludes.
How we establish it
- Teardown. Attendance at detanking and disassembly, usually jointly with the manufacturer and other parties, with measurements and photographs recorded as the unit comes apart
- Event records. Relay event files, waveform captures, meter logs and control system records, assembled into a timeline that shows where the fault started and how it was cleared
- Test records. Factory acceptance tests, commissioning tests, insulation tests and dissolved gas analysis, read against the standards they were done to
- Protection review. Coordination studies and as-found settings checked against accepted practice, to confirm or exclude the protection scheme as a cause
- Installation review. The as-built condition compared with drawings, the manufacturer's instructions and the code in force at the time
Sudden failure or gradual deterioration
Whether equipment failed from a sudden event or reached the end of a long deterioration is often the question a file turns on. Insulation condition, gas history, thermal evidence and maintenance records answer it, and we report what they show.
Damage, repair and the rest of the fleet
Once the cause is established we define the extent of the damage, the repair or replacement the loss requires, and whether the pricing matches it. Where the cause is one that sister units share, we say so and recommend what to monitor.
Recent investigations
Transformer failure investigation — industrial distribution system — A recently commissioned transformer failed on re-energisation and tripped the site's main substation. Relay event data placed the fault in the transformer, teardown established the cause, and the protection design was excluded.
Unit substation failure investigation — medium-voltage service entrance — A unit substation fault traced to how its secondary conductors were installed. Later damage to the transformer was identified as a separate cause.
Related
Forensic electrical engineering · Power quality loss investigation · Protection coordination studies · Insurance and legal
Send us a file
Submit an assignment with the loss description and any photographs, or call 1 (866) 577-1894. Call before the failed equipment is moved or repaired.